Watersupply and facilities for condensation of drinkable water
REGIONAL
PLUMBING TUZLA - ZIVINICE - LUKAVAC
By
quantity of capping water of q = 750 l/sec. The main distribution
centre in Zivinice and sources in Stupari, Toplice and Spacko Polje.
The main distribution tank by volume of 2000 to 5000 m3
in Zivinice, Husinu near Tuzla, Tuzla (five tanks) and Lukavac.
Piping of steel C 400, 500, 600 and 700 mm. System is controled
from the main pumping station in Zivinice, where all informations
about flows, water levels and conditions in complete system are.
It is applied radio link that good operates.
REGIONAL
PLUMBING TRAVNIK - N.TRAVNIK - VITEZ AND ZENICA
The
main source for supplying quoted above towns of Regional plumbing
Plava Voda Travnik is well-known source Plava Voda in Travnik by
capacity of minimum q = 1000 l/sec. Quoted quantities of water are
taken and distributed for supplying towns Travnik - N.Travnik -
Vitez and Zenica.
capping
source Plava Voda with capacity from q = 1000 to 3500 l/sec
section head
object
object for protection
of source
distribution
piping Travnik - N.Travnik - Vitez - Zenica leugth 50 kilometers
tanks of quoted
towns about 15000 m3 volume
pumping stations
in system and other objects
System is handled
from the main section head object in Travnik, where all necessary
informations are coming grom complex system of regional plumbing
Plava Voda Travnik.
PLUMBING
OF TOWN AND SUBURBS - TRAVNIK
Water
- supplying of town in built from the source Basbunar (q = 100 l/sec.)
gravitationaly and from the source Plava Voda by pumping (q = 220
l/sec.). The town is supplied in two height of areas. At the source
Plava Voda is built a pumping station. The three main tanks in town
are forescen by volume of 500 to 2000 m3.
PLUMBING
OF TOWN AND SUBURBS - DOBOJ
The
projected installation for 80000 inhabitants. The source is in Doboj
by quantity of 120 l/sec, and others on the territory RUDANKA by
the quantity of q = 130 l/sec. From both sources the underground
water is used with alluviums by pumping wells, from there later
is thrown into town network tanks. The system is handled and the
work is controled and pumping station are in Doboj. Since it is
built installation for three heights of areas, the main objects
are connected by remote control and partly by cable links and partly
radio links.
THE
MAIN PROJECT OF WATER SUPPLYING SYSTEM OF TOWN BREZA AND SUBURBS
Getting
water is from the source Milkina Vrela, which is 4,5 kilometers
far from the town. Productivity of the source is q = 100 litars
per second. Additional source is openly waterflow of Mala Rijeka,
with capacity of q = 80 litars per second which is 7 kilometers
far from Milkino Vrelo. Pump station Medica pumps in town Breza,
as distributing net of town. Reservoirs Kriz by volume of V = 500
cube meters and reservoir Smailbegovici V = 2000 cube meters.
THE
MAIN PROJECT OF RECONSTRUCTION OF INCOMING PIPELINE MAHMUTOVICA
RIVER SETTLEMENT ZUPCA AND PODGORA NEAR BREZA
Incomong
pipeline C 300 mm, lenght from the place of getting water to
the settlement 14 kilometers. Reservoirs are in settlements by volume
of V = 500 cube meters. Distributions net of settlement.
PLUMBING
OF TOWN AND INDUSTRY IN SREBRENICA
Scoop
water is from open flow of the river Jadar distrant 15 kilometres
from town. The quantity of scoop water is q = 100 l/sec. Water consists
of linked iron. Devices for condensation are built by scoop in Jadar
and Dudina, piping to town and delivery network of cast iron and
steel are foreseen. Three areans are for supplying town. The common
tank is for two areas with interruption chamber.
THE
MAIN PROJECT OF WATER SUPPLYING OF TOWN AND INDUSTRY IN ROGATICA
Capping
of the source Seljani is q = 20 l/sec, and the source Zilicina q
= 60 l/sec. System is of the gravitation pump. The tanks are at
two locations by V = 2 x 300 m3. Total V = 1200 m3.
One pump station is for pushing water into tank.
THE
MAIN PROJECTS OF PLUMBING SRBAC
For
water supplying of town Srbac and industry is foreseen from two
pumping wells by capacity q = 100 l/sec. Both wells are pushing
water 6 kilometers to town tanks, from there is later distributed
in delivery network.
The
tanks are 2 x 2000 m3.
THE
MAIN PROJECTS FOR WATER SUPPLYING OF SETTLEMENTS AND INDUSTRY IN
JELAH NEAR DOBOJ
The
settlement and industry are supplied from pumping wells near river
Usora with quantity of water q = 20 l/sec for the first phase and
q = 50 l/sec for the second phase. The water is pumping into tank
over the settlement with volume V = 2 x 300 m3.
THE
MAIN PROJECTS FOR DELIVERY PLUMBING NETWORK OF TOWN AND INDUSTRY
IN LUKAVAC NEAR TUZLA
The
plumbing network is projected for settlement of 25000 inhabitants.
The tank has volume V = 2 x 1000 m3.
THE
MAIN PROJECTS OF PLUMBING IN SETTLEMENT KOTORSKO NEAR DOBOJ
The
settlement of 6000 inhabitants size, water is pumped from wells
by capacity q = 20 l/sec and pushing into tank volume V = 2 x 150
m3. Object is working without crew.
WATER
SUPPLYING AND DRAINING WITH REFINING WASTE WATERS OF THE SUGAR FACTORY
IN BIJELJINA
Water
supplying of the sugar factory is built by three pumping wells by
total aboundant of q = 300 l/sec. Water is pushing in the main tank
in the factory where it is specially built pumping station for recirculation
of water in order to supply the factory with industrial water. It
is separate system of drinking water.
Draining
all waste water from the factory is built by the separate networks
and all water are drained onto central installations for refining
where one part of water is partially refined and later turn back
to the factory, while the
second
part is refined with output values efluenta of 30 mg1 BPK5. Equipment
on installations is from the firm PASSAVAN in West Germany.
The
object is built and still two years is in exploation. The projected
quantities of sugar is proved.
THE
RECREATION CENTRE DRVAR
Water
supplying and draining rainfall and waste water of the recreation
centre Drvar according to urban plan of Centre.
THE
MAIN PROJECT OF INDUSTRIAL COMPLEX COL-7 IN IRAQ
THE
MAIN PROJECTS OF SALT WATER PIPES IN TUZLA OF SALT WELLS OF THE
MAINE TUSANJ DO SALTWORKS IN KREKA
The
salt water pipes are projected on the quoted places in the passing
canals where the possibility of building onto the new salt water
tubes is foreseen.
DRAINAGE
SYSTEM OF REINFALL AND WASTE WATERS OF TOWN DOBOJ
Mixed
drainage system. Surface of drainage is 1000 ha. One part of towns
area is going into river Bosnia gravitationaly, untill the bigger
part is repumping using the main pump station during big level of
water in the river Bosnia. Mountain water is specially scooped and
drained by lateral canals gravitationaly in the river Bosnia.
DRAINAGE
SYSTEM OF TOWN TRAVNIK
Drainage
system of town Travnik is adpted as mixed system for the size of
town of 30000 inhabitants. Almost all network is built.
THE
MAIN PROJECT OF DRAINAGE SYSTEM OF TOWN ROGATICA WITH EQUIPMENTS
FOR REFINING
The
drainage system of town Rogatica is adopted as mixed sistem for
the size of town of 15000 inhabitants. Draining water from town
with two main collectors on common device for fefining gravitationaly.
In the front of the device is foreseen the pumping station for waste
water. The devices are built for inhabitants and industry - slaughter
houses and other industries with biology treatment waste waters
by BPK5 on exit in recipient are 20 mg/l.
THE
MAIN PROJECTS OF DRAINAGE SYSTEM OF TOWN AMANA - JORDAN
THE
MAIN PROJECTS OD DRAINAGE SYSTEM SPORT-CENTRE JARMUK - AMAN - JORDAN
THE
MAIN PROJECTS OF DRAINAGE SYSTEM OF TOWN BILECA
The
drainage system of town Bileca is built as separate system. Draining
waste and rainfall water from settlement is gravitationaly releasing
into lake after installation for refining with BPK5 = 20 mg/l.
THE
MAIN PROJECT OF THE MAIN COLLECTOR FOR WASTE WATER
The
factory POBJEDA in Gorazde.
THE
MAIN PROJECT OF DRAINAGE SYSTEM FOR REFINING WASTE WATER OF TOWN
AND INDUSTRY SRBAC
The
drainage system is separation built. All water is draining gravitationaly
from town to the pumping station for rainfall water with capacity
q = 5000 l/sec and for waste water with the help of which waste
water are pumping to the installlations for refining and then going
into the river Sava. Devices have dimensions for 30000 inhabitants
with BPK5 on exit in recipient with 25 mg/l.
THE
DRAINAGE SYSTEM WITH DEVICES FOR REFINING WASTE WATER OF TOWN AND
INDUSTRY IN TESANJ
The
drainage system of the proposal of town Tesanj and industry in Bukve.
It is mixed system. Drainag of all water to devices for refining
is gravitationaly. Devices for refining waste water are located
at the area of Bukve. Refining is mechanical - biological.
THE
MAIN PROJECTS OF DEVICES FOR REFINING WASTE WATER OF THE VEGETABLE
FACTORY IN JANJA NEAR BIJELJINA
Drevices
for refining waste water of the vegetable factory in Janja are built
for mechanical - biological refining before releasing into the river
Drina. Efluent of releasing by load efluents of 25 mg/l BPK5 by
day.
THE
MAIN PROJECTS FOR REGULATION OF BROOKS MAKLJENOVAC, MILJKOVAC AND
ORASJE IN DOBOJ
The
quoted brooks are regulated and connected with one brink canal and
positioned into the river Bosnia gravitationaly. In such a way town
Doboj is protected of flood mountain water. Minimum quantity is
q = 150 m3/sec.
THE
MAIN PROJECT FOR CONDENSATION DRINKING WATER FOR NEEDS OF TOWN SVETI
NIKOLA NEAR SKOPLJE IN MACEDONIA
Town
Sveti Nikola needs quantity of water for inhabitants and industry
of q = 300 l/sec. Scoop of raw water is from the main roud canal
which is connected to accumulation. The base objects of installations
are: scoop on the canal, bringing up pipes to agitator, agitator
and coagulator, selfrinsing gravitational filters by type “HIDROTEHNIKA”
KLADANJ, tank for clean water and the main plant object with devices
for disinfection water and for running the plant.
INSTALLATION
FOR PREPARATION DRINKING WATER FOR SETTLEMENTS BREZA NEAR SARAJEVO,
capacity q = 50 l/sec
INSTALLATION
FOR PREPARATION DRINKING WATER FOR NEEDS OF TOWN AND INDUSTRY IN
KAKANJ, capacity q = 150 l/sec
THE
MAIN PROJECTS OF INSTALLATIONS FOR PREPARATION DRINKING WATER FOR
NEEDS OF TOWN AND INDUSTRY IN ILIJAS, capacity q = 150 l/sec
Scoop
width of water from the river Misoca. The main objects are: scoop
on the river Misoca with pumping station and pressuring water to
installation.
THE
MAIN PROJECTS OF INSTALLATION FOR PREPARATION DRINKING WATER FOR
NEEDS OF TOWN AND INDUSTRY IN NEVESINJE, capacity q = 100 l/sec
The
main objects are: scoop from acumullation “ALAGOVAC” with pumping
station and pressuring water to installation.
Installation
consists of dinamic deposit room, filters of basen with clean water
and installation objects.
THE
MAIN PROJECTS OF INSTALLATION FOR PREPARATION DRINKING WATER FOR
NEEDS OF THE FACTORY “POBJEDA” IN GORAZDE, WITH CAPACITY OF q =
50 l/sec
THE
MAIN PROJECTS OF INSTALLATION FOR PREPARATION DRINKING WATER FOR
NEEDS OF TOWN, MAGLAJ CAPACITY OF 30 l/sec.
THE
MAIN PROJECTS OF INSTALLATION FOR PREPARATION DRINKING WATER FOR
NEEDS OF INDUSTRY IN POTOCARI NEAR SREBRENICA capacity q = 50 l/sec
THE
MAIN PROJECT OF INSTALLATION FOR PREPARATION DRINKING WATER FOR
NEEDS RMK “BRATSTVO” NOVI TRAVNIK, capacity q = 100 l/sec
At
all installations in raw water the muddy water is excluded, as mostly
iron and mangan. Today all installations are used and they give
drinking water according to standards of good drinking water.
THE
MAIN PROJECT OF DRAINAGE SYSTEM FOR WASTE WATER OF DUBROVNIK
Drainage
system is separate. In drainge system are included waste waters
of 41200 inhabitants 25000 tourists 15000 passing guests and industry.
Total quantity of waste waters which come to device is 900 litart
per second. Disposition solution includes work of 8 relay pump stations
(Sv.Jakov, Ploce, Pile, Batala, Gliman, Gruz, Kantafig and Lapad)
with underfield pumps and management from one centre (managerial
building “Vodovod” in Dubrovnik). The final disposition of waste
waters after device for cleaning (Lapad) is a doffuse outlet under
the sea of distance 1,0 kilometer approximatively. Review situation
1:10000 with concept of solution Ideological project of the rainfall’s
drainage system of Dubrovnik will be delivered.
THE
MAIN PROJECT OF DRAIN AGE SYSTEM FOR WASTE WATERS OF TREBINJE
Drainage
system is seprate.
two
floodeds under the river Trebisnjica lenght = 125 meters, lenght
= 80 meters. In drainage system are included waste waters of 85500
inhabitants and industry. Total quantity of wastw waters which come
to device is 1500 litars per second. Disposition solution makes
possible gravitational flows all to device for cleaning. The final
disposition of waste waters after device for cleaning is drainage
in the river Trebisnjica.
THE
MAIN PROJECT OF RAINFALL DRAINAGE SYSTEM OF TREBINJE
According
to the configuration of terrain are directly draining on seven places
in the river Trebisnjica.Also the review situation with concept
of solution will be delivered.
THE
MAIN PROJECT OF DRAINAGE SYSTEM OF BOSANSKI BROD
Mixed
drainage system. In drainage system are included waste waters of
20000 inhabitants industry surface and part of underground waters
two rain overflows with raised threshold are releasing the system
and in the rain period are taking away the part of rainfall waters
into the land-reclamation system in the quantity of 7 cube meters
per second.
The
total quantity of waste diluted waters which come to device is 800
litars per second. Dispositional solution makes possible gravitational
flows all to devices for cleaning. The final disposition of waste
waters after device for cleaning is drainage into the land.reclamation
system and the river Sava. the review situation with concept of
solution will be delivered also.
THE
IDEOLOGICAL PROJECT OF THE LAND-RECLAMATION PUMP STATION WITH CAPACITY
OF 10 CUBE METERS PER SECOND.
THE
MAIN PROJECT OF DRAINAGE SYSTEM OF ORASJE
mixed drainage
system In drainage system are included waste waters of 7000 inhabitants
industry surface and part of underground waters. The total quantity
of waste diluted wasters which come to device is 345 litars per
second. Dispositional solution makes possible gravitational flows
all to device for cleaning. The final disposition of waste waters
after device for cleaning is drainage into the river Sava using
pump station. The review situation with conception of solution will
be delivered.
THE
MAIN PROJECT OF PUMP STATION FOR CASTING
rainfalls
and waste cleaned waters into the river Sava capacity of pump station
is 2100 litars per second.
THE
MAIN PROJECT OF DRAINAGE SYSTEM OF TRNOVO
Separate
drainage system. In drainage system are included waste waters of
5000 inhabitants industry. The total quantity of waste waters which
come to device is 60 litara per second. Dispositional solution makes
possible gravitational flows all to devices for cleaning. The final
disposition of waste waters after device for cleaning is drainage
into the river Zeljeznica. the review situation with conception
of solution will be delivered. Drainage system of the complex of
commemorative house “Mitar Trifunovic Uco” with pump station.
THE
MAIN PROJECT OF DEVICES FOR CLEANING WASTE WATERS OF TREBINJE
Mechanical-biological
cleaning on the base of active mud with separated stabilization
of mud.Capacity of devices First phase 50000 ES Second phase 10000
ES. Quantities of waste waters which dispatch to devices inhabitants 10500
cube meters per day industry 1655 cube meters per day. The
final disposition of waste waters after devices for cleaning is
the river Trebisnjica (with BPK5 20 mg/l).The review situation with
conception of solution will be delivered.
THE
MAIN PROJECT OF DEVICES FOR CLEANING WASTE WATERS OF GRADACAC
Mechanical-biological
cleaning on the base of active mud, with separated stabilization
of mud. In drainage system are included waste waters of: 10000 inhabitants
industry partly of rainfall waters. Capacity of devices 10000 ES
(inhabitants) 20000 ES (industry) The total quantity of waste waters
which come to device is 115 litars per second. Dispositional solution
makes possible gravitational flows all to devices for cleaning.
The final disposition of waste waters after devices for cleaning
is drainage into the river Gradasnjica (with efluent of 20 mg/l).
The review situation with conception of solution will be delivered.
THE
MAIN PROJECT OF DEVICES FOR CLEANING WASTE WATERS OF ORASJE
Mechanical-biological
cleaning on the base of active mud with separated stabilization
of mud. In drainage system are included waste waters of 7000 inhabitants
industry. Capacity of devices 10000 ES (inhabitants + industry).
The total quantity of waste waters which come to device is 100 litars
per second. Dispositional solution makes possible ravitational flows
all to devices for cleaning. The final disposition of waste waters
after device for cleaning is drainage into the river Sava. (with
efluent of 20 mg/l).
THE
MAIN PROJECT OF DEVICES FOR CLEANING WASTE WATERS OF TRNOVO
Mechanical-biological
cleaning on the base of active mud with separated stabilization
of mud. In drainage system are included waste waters of 5000 inhabitants
ES industry
Capacity
of devices total 7000 EBS.
The
total quantity of waste waters which come to device is 40 litars
per second.Dispositional solution makes possible gravitational flows
al to devices for cleaning.The final disposition of waste waters
after device for cleaning is drainage into the river Zeljeznica
(with exit efluent of 20 mg/l).
THE
MAIN PROJECT OF DRAINAGE SYSTEM OF LASTVA WITH DEVICE FOR CLEANING.
THE
IDEOLOGICAL PROJECT OF DEVICES FOR CLEANING WASTE WATERS OF FOCA
In
drainage system are included waste waters of: 20500 inhabitants.
the total quantity of waste waters which come to device is 60 litars
per second. Dispositional solution doesn’t make possible gravitational
flows of waste waters to device but there is one system with prior-to
pump station. The final disposition of waste waters after device
for cleaning is drainage ito the river Drina.
THE
MAIN PROJECT OF INCOMING PIPELINES OF DRINKING WATER FOR FOCA
In
line Lucka Vrela - reservoir with drainpipe to hydroelecric power
station Buk Bijela. The total lenght of the whole system is 16 kilometers
approximately. The capacity of pipeline is 200 litars per second.Determined
pipelines are of asbestos and cement C 350 mm class “D”. The
main project of incoming pipeline of drinking water for USTIKOLINA.
In line Foca - new reservoir. The total lenght of pipeline is 10065
meters. Capacity of pipeline is 20 litars per second.Determined
pipelines are of asbestos and cement.
THE
MAIN PROJECT OF INCOMING PIPELINE OF DRINKING WATER FOR VISEGRAD
In
line Dobrun - reservoir Visegrad. The total lenght of pipeline is
11500 meters. Capacity of pipeline is 100 litars per second. Determined
pipes are of asbestos and cement C 300 mm. The review situation
1:25000 with conception of solution will be delivered.
THE
MAIN PROJECT OF CENTRAL PUMP STATION OF WATER SUPPLYING SYSTEM DERVENTA
Capacity
of object is 100 litars per second.
THE
MAIN PROJECT OF WELLS OBJECT OF WATER SUPPLYING SYSTEM OF DERVENTA
THE
MAIN PROJECT OF WATER SUPPLYING SYSTEM OF BILECA
Pump
station with capacity of 240 litars per second. Filter station with
capacity of 240 litars per second. Pushing pipelines by profile
of 500 mm, 400 mm and 200 mm.
WATER
SUPPLYING SYSTEM FOR UNIS FACTORY AND COLLING ROOM IN KOPACI
Lenght
of 5500 kilometers Capacity of 10 litars per second. Objects: for
capping, unloading chambers, reservoir.
WATER
SUPPLYING SYSTEM OF SURFACE MINE IN BANOVICI
WATER
SUPPLYING SYSTEM FOR AREA OF VINSKA (BOSANSKI BROD)
WATER
SUPPLYING SYSTEM FOR AREA OF MODRAN (DERVENTA)
WATER
SUPPLYING SYSTEM FOR HYDROELECTRIC POWER STATION VISEGRAD
WATER
SUPPLYING SYSTEM VISEGRAD - VISEGRAD’S BATH
WATER
SUPPLYING SYSTEM FOR MINE OF LEAD AND ZINC VARES
WATER
SUPPLYING SYSTEM FOR VARES (OBJECTS FOR CAPPING, UNLOADING CHAMBER,
CHANGING OF LINE, RESERVOIRS)
THE
MAIN PROJECT OF THE RESERVOIR IN BILECA capacity
2 x 2500 cube metars = 5000 cube meters
THE
MAIN PROJECT OF THE RESERVOIR IN TREBINJE capacity 2 x 2000
cube meters = 4000 cube meters
THE
MAIN PROJECT OF THE RESERVOIR IN VISEGRAD capacity
2 x 1000 cube meters = 2000 cube meters
THE
MAIN PROJECT OF THE RESERVOIR IN DERVENTA capacity 2 x 1000
cube meters = 2000 cube meters
THE
MAIN PROJECT OF THE RESERVOIR IN BILECA
capacity 2 x 1000 cube meters = 2000 cube meters
THE
MAIN PROJECT OF THE RESERVOIR IN USTIKOLINA
capacity 2 x 200 cube meters = 400 cube meters
THE
MAIN PROJECT OF THE RESERVOIR IN GORAZDE
UNIS FACTORY AND COOLING ROOM capacity
200 + 100 = 300 cube meters
THE
MAIN PROJECT OF THE RESERVOIR IN VARES capacity 2 x 300 cube
meters
THE
MAIN PROJECT OF THE RESERVOIR IN VARES
capacity 300 cube meters
THE
MAIN PROJECT OF THE RESERVOIR IN VISEGRAD
capacity 200 cube meters
THE
MAIN PROJECT OF THE RESERVOIR IN VARES capacity 110 cube meters
THE
MAIN PROJECT OF THE RESERVOIR IN BOSANSKI BROD capacity 200
cube meters type Hidroglobus.
|